Case Studies

Real problems, real builds, measurable results

NovaTech Solutions ๐Ÿ‡บ๐Ÿ‡ธ

Industry: Enterprise SaaSServices: QA & Test Engineering

Regression testing cut from 3 days to 4 hours with a full Playwright migration.

The Challenge

NovaTech's Selenium-based regression suite took 3 days to run, was flaky, and blocked every release. Engineers spent more time re-running failed tests than shipping features.

What We Built

We migrated 1,800+ tests to Playwright with parallel execution in CI, rebuilt the flakiest suites around stable selectors and network mocking, and integrated quality gates into their GitHub Actions pipeline.

The Results

faster regression cycle โ€” 3 days down to 4 hours
94%

faster regression cycle โ€” 3 days down to 4 hours

test stability, up from roughly 80%
99.2%

test stability, up from roughly 80%

release frequency within one quarter
2ร—

release frequency within one quarter

Manotwam logo

Manotwam ๐Ÿ‡ฎ๐Ÿ‡ณ

Industry: Wellness & ServicesServices: Custom Software Development

A digital transformation that streamlined operations end to end.

The Challenge

Manotwam ran bookings, client records, and billing across spreadsheets and disconnected tools โ€” causing double entry, errors, and hours of manual admin every week.

What We Built

We built a unified web platform covering scheduling, client management, payments, and reporting, with role-based access and an admin dashboard, deployed on cloud infrastructure sized to their budget.

The Results

less time spent on manual administration
60%

less time spent on manual administration

faster client onboarding
3ร—

faster client onboarding

platform uptime since launch
99.9%

platform uptime since launch

Vunnr logo

Vunnr ๐Ÿ‡ฎ๐Ÿ‡ณ

Industry: Consumer Tech StartupServices: Software Development + QA

From idea to a scalable, well-tested product โ€” with QA built in from day one.

The Challenge

As an early-stage startup, Vunnr needed to ship an MVP fast โ€” without accumulating the technical debt and post-launch defects that kill momentum.

What We Built

We delivered the MVP in agile sprints with test automation written alongside every feature, CI/CD from week one, and a scalable architecture ready for growth.

The Results

from kickoff to production launch
12 wks

from kickoff to production launch

critical defects post-launch
0

critical defects post-launch

automated test coverage at launch
85%

automated test coverage at launch

Want results like these?

Tell us about your challenge and we'll show you how we'd approach it.